Joy Riders USA

Monroe Township Bike Trail — asphalt rail return

New Jersey · Rail-trail

Join the designated path toward Glassboro for up to two miles and retrace. Stop at Chestnut, Oak, Church and other crossings; working roads, school grounds and unfinished extensions are excluded.

Access note. Urban crossings require stopping. Municipality identifies school parking, but school/event restrictions are not resolved here; no unrestricted school parking is offered.
Open this ride in the finderDirections

Plan your ride

Location
Williamstown · New Jersey
Ride length
Up to 4 miles return
Ride format
Out and back
Surface
Asphalt main municipal rail-trail
Road crossings
Yield to walkers and slow at junctions. Stop and look at every street crossing; do not use traffic lanes to bypass a closure.
Elevation
Generally gentle terrain with local ramps, crossings and bridge approaches; no maximum-grade survey.
Starting location
Monroe public bicycle-path crossing at Blue Bell Road, Williamstown, NJ

Selected outward cap and the same return; turn earlier at the actual route end or a barrier. Parking walks are extra.

Public named facility/address locality reference, not an exact parking entrance or stall. Follow the separate written public start.

Monroe Township Bike Trail — asphalt rail return — detailed guide

Source review: 2026-10-23. A dated source review does not guarantee current-day conditions.

A selected outing on a documented improved bicycle route. Follow the stated public start and course.

Start and parking

Start: Monroe public bicycle-path crossing at Blue Bell Road, Williamstown, NJ.

No verified dedicated trail parking at this named public access. Arrive by lawful public pedestrian/bicycle access, or independently arrange lawful visitor parking and walk to the path. Private, business and reserved lots are not assumed available.

Ride and distance

Selected ride: Up to 4 miles return. Format: Out and back.

Ride: Join the designated path toward Glassboro for up to two miles and retrace. Stop at Chestnut, Oak, Church and other crossings; working roads, school grounds and unfinished extensions are excluded.

Selected outward cap and the same return; turn earlier at the actual route end or a barrier. Parking walks are extra.

Surface and effort

Asphalt main municipal rail-trail. Generally gentle terrain with local ramps, crossings and bridge approaches; no maximum-grade survey.

Crossings and shared use

Yield to walkers and slow at junctions. Stop and look at every street crossing; do not use traffic lanes to bypass a closure. Yield to pedestrians, keep right, and slow at blind corners. Stop at barriers; never use a traffic-road detour to bypass a trail closure.

Hours, costs and access

Use daylight and obey posted trail, park and parking hours. Follow current public visitor-parking terms; reserved activities and events have separate conditions.

Reviewed 2026-10-23. Source-backed selected improved bicycle course. Urban crossings require stopping. Municipality identifies school parking, but school/event restrictions are not resolved here; no unrestricted school parking is offered. Check posted access before travel; this is not a field inspection or a whole-network all-clear. This is a source review, not a same-day inspection. Recheck the linked manager before travel.

Map and Directions

Use the named public start and its posted parking signs. The map reference identifies the facility or selected trail area; it is not a surveyed parking stall or navigable route line. Bicycle and e-bike rules can differ; only ordinary bicycle use is established unless noted.

Sources

Manager information

Trail manager / source

More rides in this state