Joy Riders USA

Edgar Felix Bikeway — paved return from Hospital Road

New Jersey · Rail-trail

Join the separated Edgar Felix corridor toward Manasquan for up to two miles and retrace, stopping at crossings and before traffic-road gaps. Natural Allaire mountain-bike trails and ordinary park roads are excluded.

Access note. Paved bikeway only. NJDOT’s directory is dated evidence; check current crossings and posted works. No verified dedicated parking at the named public access.
Open this ride in the finderDirections

Plan your ride

Location
Wall Township · New Jersey
Ride length
Up to 4 miles return
Ride format
Out and back
Surface
Paved designated former-rail bikeway
Road crossings
Yield to walkers and slow at junctions. Stop and look at every street crossing; do not use traffic lanes to bypass a closure.
Elevation
Generally gentle terrain with local ramps, crossings and bridge approaches; no maximum-grade survey.
Starting location
Edgar Felix public bikeway access at Hospital Road, Wall Township, NJ

Selected outward cap and the same return; turn earlier at the actual route end or a barrier. Parking walks are extra.

Selected public named place with explicit place coordinates, not viewport or a surveyed parking stall. Use the independently documented written public start.

Edgar Felix Bikeway — paved return from Hospital Road — detailed guide

Source review: 2026-10-23. A dated source review does not guarantee current-day conditions.

A selected outing on a documented improved bicycle route. Follow the stated public start and course.

Start and parking

Start: Edgar Felix public bikeway access at Hospital Road, Wall Township, NJ.

No verified dedicated trail parking at this named public access. Arrive by lawful public pedestrian/bicycle access, or independently arrange lawful visitor parking and walk to the path. Private, business and reserved lots are not assumed available.

Ride and distance

Selected ride: Up to 4 miles return. Format: Out and back.

Ride: Join the separated Edgar Felix corridor toward Manasquan for up to two miles and retrace, stopping at crossings and before traffic-road gaps. Natural Allaire mountain-bike trails and ordinary park roads are excluded.

Selected outward cap and the same return; turn earlier at the actual route end or a barrier. Parking walks are extra.

Surface and effort

Paved designated former-rail bikeway. Generally gentle terrain with local ramps, crossings and bridge approaches; no maximum-grade survey.

Crossings and shared use

Yield to walkers and slow at junctions. Stop and look at every street crossing; do not use traffic lanes to bypass a closure. Yield to pedestrians, keep right, and slow at blind corners. Stop at barriers; never use a traffic-road detour to bypass a trail closure.

Hours, costs and access

Use daylight and obey posted trail, park and parking hours. Follow current public visitor-parking terms; reserved activities and events have separate conditions.

Reviewed 2026-10-23. Source-backed selected improved bicycle course. Paved bikeway only. NJDOT’s directory is dated evidence; check current crossings and posted works. No verified dedicated parking at the named public access. Check posted access before travel; this is not a field inspection or a whole-network all-clear. This is a source review, not a same-day inspection. Recheck the linked manager before travel.

Map and Directions

Use the named public start and its posted parking signs. The map reference identifies the facility or selected trail area; it is not a surveyed parking stall or navigable route line. Bicycle and e-bike rules can differ; only ordinary bicycle use is established unless noted.

Sources

Manager information

Trail manager / source

More rides in this state