Joy Riders USA

Tribble Mill Park — paved lakeside return

Georgia · Greenway

Walk from the public main visitor area to the signed paved lake trail and follow it for up to two miles, then retrace. Keep to the paved route; do not add natural MTB/equestrian branches or the separate Harris Greenway to this distance.

Access note. Paved main trail only. Expect hills and shared park crossings; natural MTB, hiking and equestrian branches excluded.
Open this ride in the finderDirections

Plan your ride

Location
Lawrenceville · Georgia
Ride length
Up to 4 miles return
Ride format
Out and back
Surface
Paved designated main park bicycle/multi-purpose trail
Road crossings
Yield to walkers and slow at junctions. Stop and look at every street crossing; do not use traffic lanes to bypass a closure.
Elevation
Rolling Piedmont terrain with climbs, descents and access ramps. No surveyed maximum grade or uniformly flat-route claim. Walk uncomfortable slopes.
Starting location
Tribble Mill Park public main entrance, 2125 Tribble Mill Parkway SE, Lawrenceville, GA

Selected outward cap and the same return; turn earlier at the actual route end or a barrier. Parking walks are extra.

Approximate named public park/facility reference, not a surveyed entrance or parking stall.

Tribble Mill Park — paved lakeside return — detailed guide

Source review: 2026-10-22. A dated source review does not guarantee current-day conditions.

A selected outing on a documented improved bicycle route. Follow the stated public start and course.

Start and parking

Start: Tribble Mill Park public main entrance, 2125 Tribble Mill Parkway SE, Lawrenceville, GA.

Use signed ordinary public visitor spaces and walk to the trail. GIS/public facility references do not guarantee an available stall or current parking tariff. Reserved activities, private business lots and boat-trailer spaces are not assumed available.

Ride and distance

Selected ride: Up to 4 miles return. Format: Out and back.

Ride: Walk from the public main visitor area to the signed paved lake trail and follow it for up to two miles, then retrace. Keep to the paved route; do not add natural MTB/equestrian branches or the separate Harris Greenway to this distance.

Selected outward cap and the same return; turn earlier at the actual route end or a barrier. Parking walks are extra.

Surface and effort

Paved designated main park bicycle/multi-purpose trail. Rolling Piedmont terrain with climbs, descents and access ramps. No surveyed maximum grade or uniformly flat-route claim. Walk uncomfortable slopes.

Crossings and shared use

Yield to walkers and slow at junctions. Stop and look at every street crossing; do not use traffic lanes to bypass a closure. Yield to pedestrians, keep right, and slow at blind corners. Stop at barriers; never use a traffic-road detour to bypass a trail closure.

Hours, costs and access

Sunrise to sunset unless posted otherwise. Follow current public visitor-parking terms; reserved activities and events have separate conditions.

Reviewed 2026-10-22. Fresh specific county park profile distinguishes this paved main trail from natural routes. County trail rules explicitly provide bicycle speeds/yield guidance. Stay on the stated paved course; generic whole-park trail inventories are not all ordinary bicycle rides. This is a source review, not a same-day inspection. Recheck the linked manager before travel.

Map and Directions

Use the named public start and its posted parking signs. The map reference identifies the facility or selected trail area; it is not a surveyed parking stall or navigable route line. Bicycle and e-bike rules can differ; only ordinary bicycle use is established unless noted.

Sources

Manager information

Trail manager / source

More rides in this state