Tomahawk Creek Trail — reopened Leawood paved return
Kansas · Greenway
From Tomahawk Park join the separated Tomahawk Creek Trail north toward College Boulevard for up to one mile and retrace. Stay on the creek-side paved path, not the new roadway bike lanes or ordinary parkway. Turn before any current erosion barrier, flooded section or work fence.
Plan your ride
- Location
- Leawood · Kansas
- Ride length
- Up to 2 miles return
- Ride format
- Out and back
- Surface
- Paved shared-use creek trail
- Road crossings
- Yield to walkers and slow at junctions. Stop and look at every street crossing; do not use traffic lanes to bypass a closure.
- Elevation
- Creek-side path with curves and ramps; roots, mud and flood debris can add difficulty. No maximum-grade survey.
- Starting location
- Tomahawk Park public trail access,3951 West 119th Street, Leawood, KS 66209
Selected outward cap and the same return; turn earlier at the actual route end or a barrier. Parking walks are extra.
Public named park reference using explicit place coordinates, not viewport or a surveyed parking stall. Follow the written public visitor start.
Tomahawk Creek Trail — reopened Leawood paved return — detailed guide
Source review: 2026-10-22. A dated source review does not guarantee current-day conditions.
A selected outing on a documented improved bicycle route. Follow the stated public start and course.
Start and parking
Start: Tomahawk Park public trail access,3951 West 119th Street, Leawood, KS 66209.
City identifies public parking at Tomahawk Park and nearby trail access. Use the signed ordinary visitor lot; the city lists no park restroom or water fountain. Do not assume construction, soccer or private office lots are open.
Ride and distance
Selected ride: Up to 2 miles return. Format: Out and back.
Ride: From Tomahawk Park join the separated Tomahawk Creek Trail north toward College Boulevard for up to one mile and retrace. Stay on the creek-side paved path, not the new roadway bike lanes or ordinary parkway. Turn before any current erosion barrier, flooded section or work fence.
Selected outward cap and the same return; turn earlier at the actual route end or a barrier. Parking walks are extra.
Surface and effort
Paved shared-use creek trail. Creek-side path with curves and ramps; roots, mud and flood debris can add difficulty. No maximum-grade survey.
Crossings and shared use
Yield to walkers and slow at junctions. Stop and look at every street crossing; do not use traffic lanes to bypass a closure. Yield to pedestrians, keep right, and slow at blind corners. Stop at barriers; never use a traffic-road detour to bypass a trail closure.
Hours, costs and access
Use daylight and obey posted trail, park and parking hours. Follow current public visitor-parking terms; reserved activities and events have separate conditions.
Reviewed 2026-10-22. Leawood’s current project page explicitly reports the trail from College Boulevard to the 119th Street soccer fields reopened, with new asphalt in sections. This actual trail-status statement is used rather than the page’s conflicting project-year timeline. The larger 12-mile greenway and farther reaches are not certified clear by that statement. This is a source review, not a same-day inspection. Recheck the linked manager before travel.
Map and Directions
Use the named public start and its posted parking signs. The map reference identifies the facility or selected trail area; it is not a surveyed parking stall or navigable route line. Bicycle and e-bike rules can differ; only ordinary bicycle use is established unless noted.
