Joy Riders USA

Prairie Trail — Beebe Boulevard rail return

Idaho · Rail-trail

Join the named Prairie Trail at its Beebe Boulevard end and follow the separated former-rail corridor northwest for up to two miles, then retrace. Stop at street and driveway controls. Do not add the future Huetter–Meyer extension or use traffic roads to make a loop.

Access note. Road crossings and shared users. No verified dedicated parking at Beebe access. Planned Meyer extension excluded; obey city 15 mph limit and yield to walkers.
Open this ride in the finderDirections

Plan your ride

Location
Coeur d’Alene · Idaho
Ride length
Up to 4 miles return
Ride format
Out and back
Surface
Paved main former-rail trail
Road crossings
Yield to walkers and slow at junctions. Stop and look at every street crossing; do not use traffic lanes to bypass a closure.
Elevation
Generally gentle former-rail or river-corridor terrain, with local rises, ramps and crossings. No surveyed maximum-grade promise; walk uncomfortable transitions.
Starting location
Prairie Trail public Beebe Boulevard access, Coeur d’Alene, ID

Selected outward cap and the same return; turn earlier at the actual route end or a barrier. Parking walks are extra.

Mapped named Prairie Trail reference northwest of the written Beebe Boulevard start. Not a parking or entrance pin.

Prairie Trail — Beebe Boulevard rail return — detailed guide

Source review: 2026-10-22. A dated source review does not guarantee current-day conditions.

A selected outing on a documented improved bicycle route. Follow the stated public start and course.

Start and parking

Start: Prairie Trail public Beebe Boulevard access, Coeur d’Alene, ID.

No verified dedicated trail parking at this named public access. Arrive by lawful public pedestrian/bicycle access, or independently arrange lawful visitor parking and walk to the path. Private, business and reserved lots are not assumed available.

Ride and distance

Selected ride: Up to 4 miles return. Format: Out and back.

Ride: Join the named Prairie Trail at its Beebe Boulevard end and follow the separated former-rail corridor northwest for up to two miles, then retrace. Stop at street and driveway controls. Do not add the future Huetter–Meyer extension or use traffic roads to make a loop.

Selected outward cap and the same return; turn earlier at the actual route end or a barrier. Parking walks are extra.

Surface and effort

Paved main former-rail trail. Generally gentle former-rail or river-corridor terrain, with local rises, ramps and crossings. No surveyed maximum-grade promise; walk uncomfortable transitions.

Crossings and shared use

Yield to walkers and slow at junctions. Stop and look at every street crossing; do not use traffic lanes to bypass a closure. Yield to pedestrians, keep right, and slow at blind corners. Stop at barriers; never use a traffic-road detour to bypass a trail closure.

Hours, costs and access

Use daylight and obey posted trail, park and parking hours. Follow current public visitor-parking terms; reserved activities and events have separate conditions.

Reviewed 2026-10-22. Fresh city profile confirms the existing trail starts at Beebe Boulevard and runs four miles northwest to Huetter Road; another mile to Meyer Road is planned. The current-linked 2022 foundation map describes its pavement. Its 4.25-mile older version is not silently substituted for the city’s four-mile current extent. City bicycle limit 15 mph, single-file when pedestrians present. This is a source review, not a same-day inspection. Recheck the linked manager before travel.

Map and Directions

Use the named public start and its posted parking signs. The map reference identifies the facility or selected trail area; it is not a surveyed parking stall or navigable route line. Bicycle and e-bike rules can differ; only ordinary bicycle use is established unless noted.

Sources

Manager information

Trail manager / source

More rides in this state