Joy Riders USA

Poudre Trail — Lee Martinez upstream return

Colorado · Greenway

Join the paved Poudre Trail at Lee Martinez Park and follow the signed river corridor upstream toward Shields for up to two miles, then retrace. Do not head downstream into the Vine/Jerome project area or add unpaved natural-area trails.

Access note. Use the selected paved reach; obey current work barriers and the city’s 15 mph trail limit. No verified dedicated parking at the named access.
Open this ride in the finderDirections

Plan your ride

Location
Fort Collins · Colorado
Ride length
Up to 4 miles return
Ride format
Out and back
Surface
Paved designated shared-use trail; natural side trails excluded
Road crossings
Yield to walkers and slow at junctions. Stop and look at every street crossing; do not use traffic lanes to bypass a closure.
Elevation
Local ramps and rolling approaches; no surveyed maximum-grade promise.
Starting location
Lee Martinez Community Park public Poudre Trail access, Fort Collins, CO

Selected outward cap and the same return; turn earlier at the actual route end or a barrier. Parking walks are extra.

Approximate named public park/facility reference, not a surveyed trail entrance or parking stall. Follow the written public start.

Poudre Trail — Lee Martinez upstream return — detailed guide

Source review: 2026-10-22. A dated source review does not guarantee current-day conditions.

A selected outing on a documented improved bicycle route. Follow the stated public start and course.

Start and parking

Start: Lee Martinez Community Park public Poudre Trail access, Fort Collins, CO.

No verified dedicated trail parking at this named public access. Arrive by lawful public pedestrian/bicycle access, or independently arrange lawful visitor parking and walk to the path. Private, business and reserved lots are not assumed available.

Ride and distance

Selected ride: Up to 4 miles return. Format: Out and back.

Ride: Join the paved Poudre Trail at Lee Martinez Park and follow the signed river corridor upstream toward Shields for up to two miles, then retrace. Do not head downstream into the Vine/Jerome project area or add unpaved natural-area trails.

Selected outward cap and the same return; turn earlier at the actual route end or a barrier. Parking walks are extra.

Surface and effort

Paved designated shared-use trail; natural side trails excluded. Local ramps and rolling approaches; no surveyed maximum-grade promise.

Crossings and shared use

Yield to walkers and slow at junctions. Stop and look at every street crossing; do not use traffic lanes to bypass a closure. Yield to pedestrians, keep right, and slow at blind corners. Stop at barriers; never use a traffic-road detour to bypass a trail closure.

Hours, costs and access

Use daylight and obey posted trail, park and parking hours. Follow current public visitor-parking terms; reserved activities and events have separate conditions.

Reviewed 2026-10-22. City lists a 12.3-mile paved bicycle corridor and identifies Lee Martinez facilities. Its Vine/Jerome intersection project near Whitewater Park is in design/construction; this outing heads upstream instead. This is a source review, not a same-day inspection. Recheck the linked manager before travel.

Map and Directions

Use the named public start and its posted parking signs. The map reference identifies the facility or selected trail area; it is not a surveyed parking stall or navigable route line. Bicycle and e-bike rules can differ; only ordinary bicycle use is established unless noted.

Sources

Manager information

Trail manager / source

More rides in this state