North Shore Trail — paved return
Arkansas · Greenway
From Cooks Landing walk the designated public connection to the signed North Shore paved route. Follow it toward Northshore Drive for up to half a mile and retrace, turning before an ordinary road transition or barrier. Do not ride Northshore Drive or private business-park streets to extend the outing.
Plan your ride
- Location
- North Little Rock · Arkansas
- Ride length
- Up to 1 mile return
- Ride format
- Out and back
- Surface
- Asphalt city shared-use trail
- Road crossings
- Yield to walkers, slow at junctions and stop at road crossings. Do not bypass a trail barrier in traffic lanes.
- Elevation
- City describes the asphalt route as flat; approaches and intersections still need care.
- Starting location
- Cooks Landing Park public trail access, 4100 Cooks Landing Road, North Little Rock, AR
Selected outward cap and the same return. Parking walks are extra; turn earlier at an actual path end or barrier.
Approximate named public park/facility reference, not a surveyed entrance or parking stall.
North Shore Trail — paved return — detailed guide
Source review: 2026-10-22. A dated source review does not guarantee current-day conditions.
A selected outing on a documented improved bicycle path. Use the stated public start and course.
Start and parking
Start: Cooks Landing Park public trail access, 4100 Cooks Landing Road, North Little Rock, AR.
Use designated open Cooks Landing public visitor parking and walk to the North Shore path. Private business-park lots farther along the corridor are not assumed available.
Ride and distance
Selected ride: Up to 1 mile return. Format: Out and back.
Ride: From Cooks Landing walk the designated public connection to the signed North Shore paved route. Follow it toward Northshore Drive for up to half a mile and retrace, turning before an ordinary road transition or barrier. Do not ride Northshore Drive or private business-park streets to extend the outing.
Selected outward cap and the same return. Parking walks are extra; turn earlier at an actual path end or barrier.
Surface and effort
Asphalt city shared-use trail. City describes the asphalt route as flat; approaches and intersections still need care.
Crossings and shared use
Yield to walkers, slow at junctions and stop at road crossings. Do not bypass a trail barrier in traffic lanes. Yield to pedestrians, keep right, and slow at blind corners. Stop at barriers; never use a traffic-road detour to bypass a trail closure.
Hours, costs and access
Use daylight and obey posted park and trail hours. Obey posted public visitor-parking terms; event and reserved facilities have separate conditions.
Reviewed 2026-10-22. The current city trail page says all trails are now open; its dated update lists February 9–23, 2026 River Trail repairs. This is an owner notice check, not a same-day field inspection. Older 2023 tornado warnings on another bicycle page are historical and are not treated as proof every paved trail remains closed. Observe any new flood, storm or work barrier. This is a source review, not a same-day inspection. Recheck the linked manager before travel.
Map and Directions
Use the named public start and its posted parking signs. The map reference identifies the facility or selected trail area; it is not a surveyed parking stall or navigable route line. Bicycle and e-bike rules can differ; only ordinary bicycle use is established unless noted.
