Mississippi at Jefferson Barracks — paved river return
Missouri · Greenway
Join the paved Mississippi greenway from the Gold Star Pavilion/Leuthauser area toward the river confluence for up to 1.25 miles and retrace. Turn before the unbuilt River City Casino Boulevard gap; casino lots and road lanes are excluded.
Plan your ride
- Location
- St. Louis County · Missouri
- Ride length
- Up to 2.5 miles return
- Ride format
- Out and back
- Surface
- Paved designated shared-use greenway; natural side trails and traffic lanes excluded
- Road crossings
- Yield to walkers and slow at junctions. Stop and look at every street crossing; do not use traffic lanes to bypass a closure.
- Elevation
- Mostly flat to gently rolling, with access ramps and local rises.
- Starting location
- Jefferson Barracks Park public Gold Star Pavilion trailhead, 345 North Road West, St. Louis County, MO
Selected outward cap and the same return; turn earlier at the actual route end or a barrier. Parking walks are extra.
Named public facility/path locality reference, not an exact entrance or parking stall. Use the separate written public start.
Mississippi at Jefferson Barracks — paved river return — detailed guide
Source review: 2026-10-22. A dated source review does not guarantee current-day conditions.
A selected outing on a documented improved bicycle route. Follow the stated public start and course.
Start and parking
Start: Jefferson Barracks Park public Gold Star Pavilion trailhead, 345 North Road West, St. Louis County, MO.
The manager identifies this public park/trailhead access. Use only signed open visitor spaces and walk to the greenway; event, reserved and private lots are not assumed available.
Ride and distance
Selected ride: Up to 2.5 miles return. Format: Out and back.
Ride: Join the paved Mississippi greenway from the Gold Star Pavilion/Leuthauser area toward the river confluence for up to 1.25 miles and retrace. Turn before the unbuilt River City Casino Boulevard gap; casino lots and road lanes are excluded.
Selected outward cap and the same return; turn earlier at the actual route end or a barrier. Parking walks are extra.
Surface and effort
Paved designated shared-use greenway; natural side trails and traffic lanes excluded. Mostly flat to gently rolling, with access ramps and local rises.
Crossings and shared use
Yield to walkers and slow at junctions. Stop and look at every street crossing; do not use traffic lanes to bypass a closure. Yield to pedestrians, keep right, and slow at blind corners. Stop at barriers; never use a traffic-road detour to bypass a trail closure.
Hours, costs and access
Use daylight and obey posted trail, park and parking hours. Follow current public visitor-parking terms; reserved activities and events have separate conditions.
Reviewed 2026-10-22. River City Casino Boulevard connection is not fully built. Public park start only; do not use casino or school parking. Follow current manager alerts and on-site barriers; no whole-corridor all-clear. This is a source review, not a same-day inspection. Recheck the linked manager before travel.
Map and Directions
Use the named public start and its posted parking signs. The map reference identifies the facility or selected trail area; it is not a surveyed parking stall or navigable route line. Bicycle and e-bike rules can differ; only ordinary bicycle use is established unless noted.
