Joy Riders USA

MCTrail — paved Winfield return

West Virginia · Rail-trail

Follow the main MCTrail for up to one mile Retrace at the outward cap, actual end or first barrier. Ordinary-road detours and natural/technical branches are excluded.

Access note. County permits bicycles and publishes the Winfield trailhead. Meredith Tunnel farther along the corridor needs lights and current opening checks before extending; no complete tunnel traversal promised.
Open this ride in the finderDirections

Plan your ride

Location
Fairmont · West Virginia
Ride length
Up to 2 miles return
Ride format
Out and back
Surface
Paved designated county rail trail
Road crossings
Yield to walkers and slow at junctions. Stop and look at every street crossing; do not use traffic lanes to bypass a closure.
Elevation
Rail corridors can still have hills, bridge ramps and road crossings. No surveyed maximum grade; walk uncomfortable transitions and avoid ice or flood conditions.
Starting location
MCTrail public Winfield Street trailhead, Fairmont, WV

Selected outward cap and the same return; turn earlier at the actual route end or a barrier. Parking walks are extra.

Published named county trailhead coordinate; not a surveyed parking stall.

MCTrail — paved Winfield return — detailed guide

Source review: 2026-10-23. A dated source review does not guarantee current-day conditions.

A selected outing on a documented improved bicycle route. Follow the stated public start and course.

Start and parking

Start: MCTrail public Winfield Street trailhead, Fairmont, WV.

Use only signed ordinary public park/trail visitor parking under current hours, fees and event controls. Walk to the trail; private, school, college, business and reserved spaces are excluded.

Ride and distance

Selected ride: Up to 2 miles return. Format: Out and back.

Ride: Follow the main MCTrail for up to one mile Retrace at the outward cap, actual end or first barrier. Ordinary-road detours and natural/technical branches are excluded.

Selected outward cap and the same return; turn earlier at the actual route end or a barrier. Parking walks are extra.

Surface and effort

Paved designated county rail trail. Rail corridors can still have hills, bridge ramps and road crossings. No surveyed maximum grade; walk uncomfortable transitions and avoid ice or flood conditions.

Crossings and shared use

Yield to walkers and slow at junctions. Stop and look at every street crossing; do not use traffic lanes to bypass a closure. Yield to pedestrians, keep right, and slow at blind corners. Stop at barriers; never use a traffic-road detour to bypass a trail closure.

Hours, costs and access

Use daylight and obey posted trail, park and parking hours. Follow current public visitor-parking terms; reserved activities and events have separate conditions.

Reviewed 2026-10-23. Dated source review, not a field inspection or same-day all-clear. County permits bicycles and publishes the Winfield trailhead. Meredith Tunnel farther along the corridor needs lights and current opening checks before extending; no complete tunnel traversal promised. This is a source review, not a same-day inspection. Recheck the linked manager before travel.

Map and Directions

Use the named public start and its posted parking signs. The map reference identifies the facility or selected trail area; it is not a surveyed parking stall or navigable route line. Bicycle and e-bike rules can differ; only ordinary bicycle use is established unless noted.

Sources

Manager information

Trail manager / source

More rides in this state