Line Creek Trail — concrete creek-side return
Missouri · Greenway
Follow the designated Line Creek concrete path from the community-center area toward Riverside for up to three miles and retrace. Stay on the separated course and turn at an actual route end or barrier; traffic-road continuations are excluded.
Plan your ride
- Location
- Kansas City Northland · Missouri
- Ride length
- Up to 6 miles return
- Ride format
- Out and back
- Surface
- Concrete multi-use trail
- Road crossings
- Yield to walkers and slow at junctions. Stop and look at every street crossing; do not use traffic lanes to bypass a closure.
- Elevation
- Creek-side course with local rises, bridges and access ramps.
- Starting location
- Line Creek Community Center public trail access, 5940 Northwest Waukomis Drive, Kansas City, MO
Selected outward cap and the same return; turn earlier at the actual route end or a barrier. Parking walks are extra.
Selected named public map place with explicit place coordinates, not viewport coordinates. Follow the independently stated public arrival; no surveyed parking pin or navigable route.
Line Creek Trail — concrete creek-side return — detailed guide
Source review: 2026-10-22. A dated source review does not guarantee current-day conditions.
A selected outing on a documented improved bicycle route. Follow the stated public start and course.
Start and parking
Start: Line Creek Community Center public trail access, 5940 Northwest Waukomis Drive, Kansas City, MO.
County names the community center as public trail access. Use signed open public visitor spaces; reserved activities have separate controls.
Ride and distance
Selected ride: Up to 6 miles return. Format: Out and back.
Ride: Follow the designated Line Creek concrete path from the community-center area toward Riverside for up to three miles and retrace. Stay on the separated course and turn at an actual route end or barrier; traffic-road continuations are excluded.
Selected outward cap and the same return; turn earlier at the actual route end or a barrier. Parking walks are extra.
Surface and effort
Concrete multi-use trail. Creek-side course with local rises, bridges and access ramps.
Crossings and shared use
Yield to walkers and slow at junctions. Stop and look at every street crossing; do not use traffic lanes to bypass a closure. Yield to pedestrians, keep right, and slow at blind corners. Stop at barriers; never use a traffic-road detour to bypass a trail closure.
Hours, costs and access
County trail profile lists dawn to dusk; observe any earlier posted facility gates. Follow current public visitor-parking terms; reserved activities and events have separate conditions.
Reviewed 2026-10-22. County describes the established 8.4-mile concrete bicycle trail and public access points, with dawn-to-dusk use. This is a selected return rather than a full-corridor condition claim. This is a source review, not a same-day inspection. Recheck the linked manager before travel.
Map and Directions
Use the named public start and its posted parking signs. The map reference identifies the facility or selected trail area; it is not a surveyed parking stall or navigable route line. Bicycle and e-bike rules can differ; only ordinary bicycle use is established unless noted.
