Joy Riders USA

Clovis Old Town Trail — paved return from Railroad Park

California · Rail-trail

Join the signed Old Town Trail at Railroad Park and follow the paved corridor toward Old Town Clovis for up to three miles, then retrace at the actual trail end or an earlier barrier. Use the built underpasses where provided and stop at street crossings. Do not add the Dry Creek or Sugar Pine branches to this distance.

Access note. Urban rail trail with street crossings and underpass ramps. No verified dedicated trail parking; stay on the signed main route.
Open this ride in the finderDirections

Plan your ride

Location
Clovis · California
Ride length
Up to 6 miles return
Ride format
Out and back
Surface
Asphalt former-rail shared-use trail
Road crossings
Yield to walkers and slow at junctions. Stop and look at every street crossing; do not use traffic lanes to bypass a closure.
Elevation
Generally level urban rail corridor with underpass ramps and street crossings. No surveyed maximum grade.
Starting location
Railroad Park public Old Town Trail access, 805 North Peach Avenue, Clovis, CA

Selected outward cap and the same return; turn earlier at the actual route end or a barrier. Parking walks are extra.

Approximate named public park/facility reference, not a surveyed entrance or parking stall.

Clovis Old Town Trail — paved return from Railroad Park — detailed guide

Source review: 2026-10-22. A dated source review does not guarantee current-day conditions.

A selected outing on a documented improved bicycle route. Follow the stated public start and course.

Start and parking

Start: Railroad Park public Old Town Trail access, 805 North Peach Avenue, Clovis, CA.

No verified dedicated trail parking at this named public access. Arrive by lawful public pedestrian/bicycle access, or independently arrange lawful visitor parking and walk to the path. Private, business and reserved lots are not assumed available.

Ride and distance

Selected ride: Up to 6 miles return. Format: Out and back.

Ride: Join the signed Old Town Trail at Railroad Park and follow the paved corridor toward Old Town Clovis for up to three miles, then retrace at the actual trail end or an earlier barrier. Use the built underpasses where provided and stop at street crossings. Do not add the Dry Creek or Sugar Pine branches to this distance.

Selected outward cap and the same return; turn earlier at the actual route end or a barrier. Parking walks are extra.

Surface and effort

Asphalt former-rail shared-use trail. Generally level urban rail corridor with underpass ramps and street crossings. No surveyed maximum grade.

Crossings and shared use

Yield to walkers and slow at junctions. Stop and look at every street crossing; do not use traffic lanes to bypass a closure. Yield to pedestrians, keep right, and slow at blind corners. Stop at barriers; never use a traffic-road detour to bypass a trail closure.

Hours, costs and access

Use daylight and obey posted trail, park and parking hours. Follow current public visitor-parking terms; reserved activities and events have separate conditions.

Reviewed 2026-10-22. City’s publicly hosted 2018 parks master plan identifies the established Clovis Old Town Trail and Railroad Park; current Fresno city guidance confirms the paved cycling corridor continues into Clovis. RTC describes 5.9 miles of asphalt trail. Older 5.8-mile city and current registry scopes are not additive mileage. An older city report URL now returns 404 and is replaced by the live city-hosted plan. Check present city street and event signs. This is a source review, not a same-day inspection. Recheck the linked manager before travel.

Map and Directions

Use the named public start and its posted parking signs. The map reference identifies the facility or selected trail area; it is not a surveyed parking stall or navigable route line. Bicycle and e-bike rules can differ; only ordinary bicycle use is established unless noted.

Sources

Manager information

Trail manager / source

More rides in this state