Joy Riders USA

Chippewa River — paved Tarrant Park return

Wisconsin · Rail-trail

Join the main trail toward Eau Claire for up to two miles Retrace at the outward cap, actual end or first barrier. Ordinary traffic-road detours, horse-only and natural/technical branches are excluded.

Access note. Resurfacing from the Red Cedar junction to Fuller Road remains forecast through fall 2026. This short Durand return stays before the junction. DNR says no trail pass required on the Pepin County/Durand portion; normal public park terms apply.
Open this ride in the finderDirections

Plan your ride

Location
Durand · Wisconsin
Ride length
Up to 4 miles return
Ride format
Out and back
Surface
Asphalt main rail trail and built wood-deck bridges
Road crossings
Yield to walkers and slow at junctions. Stop and look at every street crossing; do not use traffic lanes to bypass a closure.
Elevation
Rail corridors can still have hills, ramps, bridge transitions and street crossings. No surveyed maximum grade. Use firm dry tread and suitable tires; snow, ice and hoof marks can make riding uncomfortable.
Starting location
Tarrant Park public Chippewa River trailhead, Durand, WI

Selected outward cap and the same return; turn earlier at the actual route end or a barrier. Parking walks are extra.

Public named facility/address locality reference, not an exact parking entrance or stall. Follow the separate written public start.

Chippewa River — paved Tarrant Park return — detailed guide

Source review: 2026-10-23. A dated source review does not guarantee current-day conditions.

A selected outing on a documented improved bicycle route. Follow the stated public start and course.

Start and parking

Start: Tarrant Park public Chippewa River trailhead, Durand, WI.

Use only signed ordinary public park/trail visitor spaces under current gate, vehicle-fee and event controls. Walk to the main bicycle path. Private, business, school, reserved and boat-trailer-only spaces are excluded.

Ride and distance

Selected ride: Up to 4 miles return. Format: Out and back.

Ride: Join the main trail toward Eau Claire for up to two miles Retrace at the outward cap, actual end or first barrier. Ordinary traffic-road detours, horse-only and natural/technical branches are excluded.

Selected outward cap and the same return; turn earlier at the actual route end or a barrier. Parking walks are extra.

Surface and effort

Asphalt main rail trail and built wood-deck bridges. Rail corridors can still have hills, ramps, bridge transitions and street crossings. No surveyed maximum grade. Use firm dry tread and suitable tires; snow, ice and hoof marks can make riding uncomfortable.

Crossings and shared use

Yield to walkers and slow at junctions. Stop and look at every street crossing; do not use traffic lanes to bypass a closure. Yield to pedestrians, keep right, and slow at blind corners. Stop at barriers; never use a traffic-road detour to bypass a trail closure.

Hours, costs and access

Use daylight and obey posted trail, park and parking hours. Follow current public visitor-parking terms; reserved activities and events have separate conditions.

Reviewed 2026-10-23. Source review, not a field inspection or same-day all-clear. Resurfacing from the Red Cedar junction to Fuller Road remains forecast through fall 2026. This short Durand return stays before the junction. DNR says no trail pass required on the Pepin County/Durand portion; normal public park terms apply. This is a source review, not a same-day inspection. Recheck the linked manager before travel.

Map and Directions

Use the named public start and its posted parking signs. The map reference identifies the facility or selected trail area; it is not a surveyed parking stall or navigable route line. Bicycle and e-bike rules can differ; only ordinary bicycle use is established unless noted.

Sources

Manager information

Trail manager / source

More rides in this state