Joy Riders USA

Black River Bridgeway — paved Day’s Dam return

Ohio · Greenway

Take Bridgeway south from Day’s Dam toward Bur Oak for up to two miles and retrace. Natural riverside tracks and ordinary roads are excluded.

Access note. Yield to walkers and stop at every crossing. Bridges and river flooding require care. Differing whole-system 5.5/6.5-mile descriptions are not added together.
Open this ride in the finderDirections

Plan your ride

Location
Lorain · Ohio
Ride length
Up to 4 miles return
Ride format
Out and back
Surface
Asphalt Bridgeway main hike/bike trail
Road crossings
Yield to walkers and slow at junctions. Stop and look at every street crossing; do not use traffic lanes to bypass a closure.
Elevation
Local rises, bridge ramps and crossing approaches may add effort; no surveyed maximum grade. Walk difficult or crowded slopes.
Starting location
Day’s Dam public trailhead, 2720 East 31st Street, Lorain, OH

Selected outward cap and the same return; turn earlier at the actual route end or a barrier. Parking walks are extra.

Public named facility/address locality reference, not an exact parking entrance or stall. Follow the separate written public start.

Black River Bridgeway — paved Day’s Dam return — detailed guide

Source review: 2026-10-23. A dated source review does not guarantee current-day conditions.

A selected outing on a documented improved bicycle route. Follow the stated public start and course.

Start and parking

Start: Day’s Dam public trailhead, 2720 East 31st Street, Lorain, OH.

Use signed public visitor/trailhead spaces under current hours, fees and event controls. Private, school, business, campus, golf and reserved parking is not assumed available.

Ride and distance

Selected ride: Up to 4 miles return. Format: Out and back.

Ride: Take Bridgeway south from Day’s Dam toward Bur Oak for up to two miles and retrace. Natural riverside tracks and ordinary roads are excluded.

Selected outward cap and the same return; turn earlier at the actual route end or a barrier. Parking walks are extra.

Surface and effort

Asphalt Bridgeway main hike/bike trail. Local rises, bridge ramps and crossing approaches may add effort; no surveyed maximum grade. Walk difficult or crowded slopes.

Crossings and shared use

Yield to walkers and slow at junctions. Stop and look at every street crossing; do not use traffic lanes to bypass a closure. Yield to pedestrians, keep right, and slow at blind corners. Stop at barriers; never use a traffic-road detour to bypass a trail closure.

Hours, costs and access

Use daylight and obey posted trail, park and parking hours. Follow current public visitor-parking terms; reserved activities and events have separate conditions.

Reviewed 2026-10-23. Documented selected improved bicycle course. Yield to walkers and stop at every crossing. Bridges and river flooding require care. Differing whole-system 5.5/6.5-mile descriptions are not added together. This is a dated source review, not a field inspection or same-day all-clear. This is a source review, not a same-day inspection. Recheck the linked manager before travel.

Map and Directions

Use the named public start and its posted parking signs. The map reference identifies the facility or selected trail area; it is not a surveyed parking stall or navigable route line. Bicycle and e-bike rules can differ; only ordinary bicycle use is established unless noted.

Sources

Manager information

Trail manager / source

More rides in this state