Joy Riders USA

Apple Capital — paved Walla Walla Point return; northern bridge works

Washington · Greenway

From the park follow the main west-bank paved trail south for up to one mile Retrace at the outward cap, actual end or first barrier. Traffic-road detours and natural/technical branches are excluded.

Access note. Tourism reports the Clark Pipeline Bridge and approaches closed until November 2026 for replacement; that date is a forecast, not reopening confirmation. This short park/south return does not cross it. Do not enter Horan Natural Area, where bicycles are prohibited. No full ten-mile loop promised.
Open this ride in the finderDirections

Plan your ride

Location
Wenatchee · Washington
Ride length
Up to 2 miles return
Ride format
Out and back
Surface
Paved designated riverfront bicycle trail
Road crossings
Yield to walkers and slow at junctions. Stop and look at every street crossing; do not use traffic lanes to bypass a closure.
Elevation
Local hills, bridge ramps and crossings may require effort. No surveyed maximum grade; snow, ice and wet weather can make the path unsuitable.
Starting location
Walla Walla Point Park public Apple Capital trail access, Wenatchee, WA

Selected outward cap and the same return; turn earlier at the actual route end or a barrier. Parking walks are extra.

Public named facility/address locality reference, not an exact parking entrance or stall. Follow the separate written public start.

Apple Capital — paved Walla Walla Point return; northern bridge works — detailed guide

Source review: 2026-10-23. A dated source review does not guarantee current-day conditions.

A selected outing on a documented improved bicycle route. Follow the stated public start and course.

Start and parking

Start: Walla Walla Point Park public Apple Capital trail access, Wenatchee, WA.

Use signed ordinary public park/trail visitor parking only under current gate, fee, pass and event controls. Walk to the bicycle path; private, school, business and reserved parking is excluded.

Ride and distance

Selected ride: Up to 2 miles return. Format: Out and back.

Ride: From the park follow the main west-bank paved trail south for up to one mile Retrace at the outward cap, actual end or first barrier. Traffic-road detours and natural/technical branches are excluded.

Selected outward cap and the same return; turn earlier at the actual route end or a barrier. Parking walks are extra.

Surface and effort

Paved designated riverfront bicycle trail. Local hills, bridge ramps and crossings may require effort. No surveyed maximum grade; snow, ice and wet weather can make the path unsuitable.

Crossings and shared use

Yield to walkers and slow at junctions. Stop and look at every street crossing; do not use traffic lanes to bypass a closure. Yield to pedestrians, keep right, and slow at blind corners. Stop at barriers; never use a traffic-road detour to bypass a trail closure.

Hours, costs and access

Use daylight and obey posted trail, park and parking hours. Follow current public visitor-parking terms; reserved activities and events have separate conditions.

Reviewed 2026-10-23. Source review, not a field inspection or same-day all-clear. Tourism reports the Clark Pipeline Bridge and approaches closed until November 2026 for replacement; that date is a forecast, not reopening confirmation. This short park/south return does not cross it. Do not enter Horan Natural Area, where bicycles are prohibited. No full ten-mile loop promised. This is a source review, not a same-day inspection. Recheck the linked manager before travel.

Map and Directions

Use the named public start and its posted parking signs. The map reference identifies the facility or selected trail area; it is not a surveyed parking stall or navigable route line. Bicycle and e-bike rules can differ; only ordinary bicycle use is established unless noted.

Sources

Manager information

Trail manager / source

More rides in this state